1st Quartz - Tariff 31 and 62, Residential
What it charges
- Supply charge
- $1.5240
- a day
- Usage
- 25.40c
- per kWh
Per kWh
- Single rate25.40c
- Tariff 6212.70c
- Solar feed-in, paid to you9.28c
- Solar feed-in
- 9.28c a kWh
- Contract
- Variable prices, ongoing
Prices per kWh as published; exclusive of GST unless the retailer states otherwise.
How it compares in the TasNetworks area
Where this plan's prices sit among the plans anyone can sign up for at home in the TasNetworks area, as published. Each bar counts the plans at that price, and the ink line marks this plan.
Usage rate
25.40cper kWh on this plan
The typical single-rate plan open to anyone in the TasNetworks area charges 25.40c, and the lowest 21.82c, across 18 plans.
Supply charge
$1.52a day on this plan
The typical single-rate plan open to anyone in the TasNetworks area charges $1.51 a day, and the lowest $1.10, across 18 plans.
Solar feed-in
9.28cper kWh exported on this plan
The typical plan open to anyone in the TasNetworks area that pays for exports gives 10.87c, and the most generous 11.00c, across 24 plans.
Tariff
Single Rate Tariff Period1 Jul to 30 Jun
Supply $1.5240 a day| Rate | When | Blocks | Price |
|---|---|---|---|
| General usageAnytime | All times | Flat per day | 25.40c |
Controlled load
Tariff 62
| Rate | When | Blocks | Price |
|---|---|---|---|
| Tariff 62Off-Peak, night period only (10pm to 7am) | All times | Flat per day | 12.70c |
Solar feed-in
- Standard feed-in tariff (GST exempt)Other scheme, paid by retailer9.28c a kWh
Standard feed-in tariff (GST exempt)
Discounts and incentives
- $100 in rebates (inc. GST) over 12 months $100Other, conditional
$50 credit on 6th month of billing and $50 credit on 12th month of billing. Must be supplied by 1st Energy at the time the bill is issued.
Fees
| Fee | Term | Amount | Notes |
|---|---|---|---|
| Connection | Fixed | $107.67 | Connection fee (inc. GST), generally applies for move-in requests |
| Disconnection | Fixed | $107.67 | Disconnection fee (inc. GST), generally applies for move-out requests |
| Cheque dishonour | Fixed | $15 | Cheque dishonour payment fee (inc. GST) |
| Dd dishonour | Fixed | $7.50 | Direct debit dishonour payment fee (inc. GST) |
| Paper bill | Fixed | $2.15 | Charged for providing a paper bill. |
| Payment processing | Fixed | $2.70 | May apply for over the counter payments made at an Australia Post outlet |
Eligibility
- No restrictions published.
Terms
- Prices variable: Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your nex…
- 10-day cooling off period
- Billed monthly or quarterly
- Pay by paper bill, direct debit, credit card, bpay
- On expiry: Your contract continues until terminated by you or us in accordance with our terms and conditions.
- This offer is available for customers currently taking supply on a corresponding single rate network tariff. For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1s…
- Additional fees may apply. For more information, please call 1300 426 594.
Where it's offered
Distribution network: TasNetworks (TAS).
Included postcodes
7000, 7004-7005, 7007-7012, 7015-7027, 7030, 7050, 7052-7055, 7109, 7112-7113, 7116-7117, 7119-7120, 7139-7140, 7150, 7155, 7162-7163, 7170-7180, 7182-7187, 7190, 7209-7216, 7248-7250, 7252-7254, 7258-7265, 7267-7268, 7270, 7275-7277, 7290-7292, 7300-7307, 7310, 7315-7316, 7320-7322, 7325, 7330-7331, 7466-7470
Compare it with other plans
Put this plan against your usage
Published by 1st Energy under the Consumer Data Right, via the AER's Energy Made Easy, last changed by them on 7 July 2026. Figures are shown as the institution publishes them and can change without notice; confirm on their site before applying. The Finance Algorithm earns nothing from any product listed here.