Select Resi Flat Rate + Off Peak Night Only
What it charges
- Supply charge
- $1.6380
- a day
- Usage
- 21.82c
- per kWh
Per kWh
- Single rate21.82c
- Tariff 6312.62c
- Solar feed-in, paid to you11.00c
- Solar feed-in
- 11.00c a kWh
- Contract
- Variable prices, ongoing
Prices per kWh as published; exclusive of GST unless the retailer states otherwise.
How it compares in the TasNetworks area
Where this plan's prices sit among the plans anyone can sign up for at home in the TasNetworks area, as published. Each bar counts the plans at that price, and the ink line marks this plan.
Usage rate
21.82cper kWh on this plan
The typical single-rate plan open to anyone in the TasNetworks area charges 25.40c, and the lowest 21.82c, across 18 plans.
Supply charge
$1.64a day on this plan
The typical single-rate plan open to anyone in the TasNetworks area charges $1.51 a day, and the lowest $1.10, across 18 plans.
Solar feed-in
11.00cper kWh exported on this plan
The typical plan open to anyone in the TasNetworks area that pays for exports gives 10.87c, and the most generous 11.00c, across 24 plans.
Tariff
Calendar Year14 Jul to 13 Jul
Supply $1.6380 a day| Rate | When | Blocks | Price |
|---|---|---|---|
| Tariff 93Tariff 93 | All times | Flat per year | 21.82c |
Controlled load
Tariff 63
| Rate | When | Blocks | Price |
|---|---|---|---|
| Tariff 63OffPeak - Between 10pm and 7am | All times | Flat per year | 12.62c |
Solar feed-in
- Solstice Energy Feed in TariffOther scheme, paid by retailer11.00c a kWh
Feed In Tariff
Fees
| Fee | Term | Amount | Notes |
|---|---|---|---|
| Connection | Fixed | $107.67 | Connection Fee, typically applies for move in requests. |
| Disconnection | Fixed | $107.67 | Disconnection Fee, typically applies for move out requests. |
Eligibility
- No restrictions published.
Terms
- Prices variable: We will give you notice of any variation to the tariffs and/or charges that affect you at least 5 business days before the variation is to apply to you.
- 10-day cooling off period
- Billed monthly or quarterly
- Pay by paper bill, direct debit, credit card, bpay, other
- On expiry: Contract continues until terminated by you, or by us in accordance with our terms and conditions.
- For full terms and conditions, please go to www.solsticeenergy.com.au
- No credit card fees or late payment fees are applicable.
Where it's offered
Distribution network: TasNetworks (TAS).
Included postcodes
7000, 7004-7005, 7007-7012, 7015-7027, 7030, 7050, 7052-7055, 7109, 7112-7113, 7116-7117, 7119-7120, 7139-7140, 7150, 7155, 7162-7163, 7170-7180, 7182-7187, 7190, 7209-7216, 7248-7250, 7252-7254, 7258-7265, 7267-7268, 7270, 7275-7277, 7290-7292, 7300-7307, 7310, 7315-7316, 7320-7322, 7325, 7330-7331, 7466-7470
Compare it with other plans
Put this plan against your usage
Published by Solstice Energy under the Consumer Data Right, via the AER's Energy Made Easy, last changed by them on 14 July 2026. Figures are shown as the institution publishes them and can change without notice; confirm on their site before applying. The Finance Algorithm earns nothing from any product listed here.