GEE Smart Saver ENDR Demand
- Supply charge
- $1.2555/day
- Usage per kWh
- 34.41c
- Contract
- Variable prices · ongoing
Prices per kWh as published; exclusive of GST unless the retailer states otherwise.
Single Rate Tariff Period03-01 to 02-28
Supply $1.2555/day| Rate | When | Blocks | Price |
|---|---|---|---|
| Single RateSingle Rate | All times | Flat per month | 34.41c |
| Capacity Charge (cents per kW pr day)Capacity charges are applied to the maximum half hourly kW power reading that occurred at a customer's connection point over the 12 months prior to a bill being calculated. | 00:00–00:00 | 0+ kW, day | $23.5500/KWH |
- No restrictions published.
- · Prices variable: If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable or no later than your next bill or in accordance with any applicable laws and codes.
- · 10-day cooling off period
- · Billed monthly
- · Pay by direct debit, credit card, bpay
- · For futher details on the terms and conditions of the offer, please visit www.gee.com.au or call 1300 707 042
- · For information on additional fees, please visit www.gee.com.au or call 1300 707 042
Distribution network: Endeavour (NSW).
Included postcodes
2113-2122, 2125-2126, 2142, 2145-2148, 2150-2168, 2170-2179, 2198, 2200, 2213-2214, 2233, 2250, 2257, 2283, 2304, 2323, 2325, 2328-2330, 2500, 2502, 2505-2506, 2508, 2515-2519, 2525-2530, 2533-2536, 2538-2541, 2555-2560, 2563-2580, 2622, 2745, 2747-2754, 2756-2763, 2765-2770, 2773-2780, 2782-2787, 2790, 2795, 2800, 2845-2850
Put this plan against your usage
Published by GEE Energy under the Consumer Data Right, via the AER's Energy Made Easy, last changed by them on 1 Mar 2026. Figures are shown as the institution publishes them and can change without notice; confirm on their site before applying. The Finance Algorithm earns nothing from any product listed here.