What it charges
- Supply charge
- $1.1013
- a day
- Usage
- 23.60c
- per kWh
- Solar feed-in
- 1.00c a kWh
- Contract
- Variable prices, ongoing
Prices per kWh as published; exclusive of GST unless the retailer states otherwise.
How it compares in the Citipower area
Where this plan's prices sit among the plans anyone can sign up for at home in the Citipower area, as published. Each bar counts the plans at that price, and the ink line marks this plan.
Usage rate
23.60cper kWh on this plan
The typical single-rate plan open to anyone in the Citipower area charges 21.95c, and the lowest 17.19c, across 213 plans.
Supply charge
$1.10a day on this plan
The typical single-rate plan open to anyone in the Citipower area charges $1.02 a day, and the lowest $0.47, across 213 plans.
Solar feed-in
1.00cper kWh exported on this plan
The typical plan open to anyone in the Citipower area that pays for exports gives 1.00c, and the most generous 35.00c, across 517 plans.
Tariff
Period
Supply $1.1013 a day| Rate | When | Blocks | Price |
|---|---|---|---|
| RateAll times of the day | All times | Flat | 23.60c |
Solar feed-in
- Current FIT policyCurrent scheme, paid by retailer1.00c a kWh
FiT
Fees
| Fee | Term | Amount | Notes |
|---|---|---|---|
| Other | Fixed | $0 | Other fees may apply. Information available at: koganenergy.com.au/terms-conditions |
| Disconnection | Fixed | $51.95 | Disconnection fees may apply to manually de-energise a property. The fee will be passed on from your distributor and may vary. |
| Disconnection | Fixed | $0 | Disconnection fees may apply to remotely de-energise a property. The fee will be passed on from your distributor and may vary. |
| Connection | Fixed | $51.19 | Connection fees may apply to manually energise a property. The fee will be passed on from your distributor and may vary. |
| Connection | Fixed | $0 | Connection fees may apply to remotely energise a property. The fee will be passed on from your distributor and may vary. |
Eligibility
- Other: Eligibility criteria may apply, contact Kogan Energy for details.
Terms
- Prices variable: We may vary your prices in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email
- 10-day cooling off period
- Billed monthly
- Pay by other
- On expiry: This is an ongoing contract (until you or we end it) with no exit fees.
- A credit card or direct debit payment method is required as part of the sign up process. Other payment methods are available. You can change your payment method by contacting Kogan on 1300 005 123. For further information in relation to th…
Where it's offered
Distribution network: Citipower (VIC).
Included postcodes
3000, 3002-3006, 3008, 3010-3011, 3031, 3051-3057, 3065-3068, 3070-3071, 3078, 3101-3104, 3121-3127, 3129, 3141-3144, 3161, 3181-3183, 3205-3207
Compare it with other plans
Put this plan against your usage
Published by Kogan Energy under the Consumer Data Right, via the AER's Energy Made Easy, last changed by them on 14 Sept 2026. Figures are shown as the institution publishes them and can change without notice; confirm on their site before applying. The Finance Algorithm earns nothing from any product listed here.