What it charges
- Supply charge
- $1.3456
- a day
- Usage
- 27.90c
- per kWh
- Solar feed-in
- 3.00c a kWh
- Contract
- Variable prices, ongoing
Prices per kWh as published; exclusive of GST unless the retailer states otherwise.
How it compares in the Endeavour area
Where this plan's prices sit among the plans anyone can sign up for at home in the Endeavour area, as published. Each bar counts the plans at that price, and the ink line marks this plan.
Usage rate
27.90cper kWh on this plan
The typical single-rate plan open to anyone in the Endeavour area charges 29.56c, and the lowest 23.80c, across 261 plans.
Supply charge
$1.35a day on this plan
The typical single-rate plan open to anyone in the Endeavour area charges $1.60 a day, and the lowest $0.96, across 261 plans.
Solar feed-in
3.00cper kWh exported on this plan
The typical plan open to anyone in the Endeavour area that pays for exports gives 3.00c, and the most generous 40.00c, across 732 plans.
Tariff
All-Year1 Jul to 30 Jun
Supply $1.3456 a day| Rate | When | Blocks | Price |
|---|---|---|---|
| Single Rate BlockUsage | All times | Flat per day | 27.90c |
Solar feed-in
- FiTOther scheme, paid by retailer3.00c a kWh
OVO Energy Retailer Feed-in-Tariff (exclusive of GST)
Fees
| Fee | Term | Amount | Notes |
|---|---|---|---|
| Connection | Fixed | $132.07 | Connection fee - Site Visit (inc GST). Fees may vary for some customers. |
| Disconnection | Fixed | $132.07 | A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers. |
| Other | Fixed | $0 | Other fees may apply. Please refer to www.ovoenergy.com.au/fees. |
Eligibility
- GreenPower: 100% GreenPower for 2.2 c/kWh inc. GST.
Terms
- Prices variable: OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.
- 10-day cooling off period
- Billed monthly
- Pay by direct debit, credit card, bpay
- On expiry: Ongoing contract with no contract term
- OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.
- OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.
Where it's offered
Distribution network: Endeavour (NSW).
Included postcodes
2113-2122, 2125-2126, 2142, 2145-2148, 2150-2168, 2170-2179, 2198, 2200, 2213-2214, 2233, 2250, 2257, 2283, 2304, 2323, 2325, 2328-2330, 2500, 2502, 2505-2506, 2508, 2515-2519, 2525-2530, 2533-2536, 2538-2541, 2555-2560, 2563-2580, 2622, 2745, 2747-2754, 2756-2763, 2765-2770, 2773-2780, 2782-2787, 2790, 2795, 2800, 2845-2850
Compare it with other plans
Put this plan against your usage
Published by OVO Energy under the Consumer Data Right, via the AER's Energy Made Easy, last changed by them on 1 Oct 2026. Figures are shown as the institution publishes them and can change without notice; confirm on their site before applying. The Finance Algorithm earns nothing from any product listed here.