- Supply charge
- $1.7686/day
- Usage per kWh
- 57.46c peak · 22.94c off-peak · 4.29c shoulder
- Solar feed-in
- 1.00c/kWh
- Contract
- Variable prices · ongoing
Prices per kWh as published; exclusive of GST unless the retailer states otherwise.
Summer: 1 Nov to 31 Mar11-01 to 03-31
Supply $1.7686/day| Rate | When | Blocks | Price |
|---|---|---|---|
| PeakPeak: 3pm-9pm All Days | Every day 15:00–20:59 | Flat per day | 57.46c |
| Off-peak6am - 3pm, 9pm - 12am | Every day 06:00–14:59; Every day 21:00–23:59 | Flat per day | 22.94c |
| Shoulder12am - 6am | Every day 00:00–05:59 | Flat per day | 4.29c |
Shoulder 1: 1 Apr to 31 May04-01 to 05-31
Supply $1.7686/day| Rate | When | Blocks | Price |
|---|---|---|---|
| Off-peak6am- 12am | Every day 06:00–23:59 | Flat per day | 22.94c |
| Shoulder12am - 6am | Every day 00:00–05:59 | Flat per day | 4.29c |
Winter: 1 Jun to 31 Aug06-01 to 08-31
Supply $1.7686/day| Rate | When | Blocks | Price |
|---|---|---|---|
| Peak3pm-9pm, all days | Every day 15:00–20:59 | Flat per day | 57.46c |
| Off-peak6am - 3pm, 9pm - 12am | Every day 06:00–14:59; Every day 21:00–23:59 | Flat per day | 22.94c |
| Shoulder12am - 6am | Every day 00:00–05:59 | Flat per day | 4.29c |
Shoulder 2: 1 Sep to 31 Oct09-01 to 10-31
Supply $1.7686/day| Rate | When | Blocks | Price |
|---|---|---|---|
| Off-peak6am- 12am | Every day 06:00–23:59 | Flat per day | 22.94c |
| Shoulder12am - 6am | Every day 00:00–05:59 | Flat per day | 4.29c |
Controlled Load 2
| Rate | When | Blocks | Price |
|---|---|---|---|
| Controlled LoadControlled Load 2 | All times | Flat per day | 21.96c |
- FiTOther · paid by retailer1.00c/kWh
OVO Energy Retailer Feed-in-Tariff (exclusive of GST)
- EV Off-Peak
$0.04725/kWh usage charge between midnight and 6am. Does not apply to controlled loads. For more information head to www.ovoenergy.com.au/electric-vehicles/
- Interest Rewards
OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill.
| Fee | Term | Amount | Notes |
|---|---|---|---|
| Connection | Fixed | $123.56 | Connection fee - Site Visit (inc GST). Fees may vary for some customers. |
| Disconnection | Fixed | $123.56 | A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers. |
| Other | Fixed | $0 | Other fees may apply. Please refer to www.ovoenergy.com.au/fees. |
- · Other: Electric Vehicle requirement - Must own an electric vehicle.
- · GreenPower: 100% GreenPower for 2.2 c/kWh inc. GST.
- · Prices variable: OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.
- · 10-day cooling off period
- · Billed monthly
- · Pay by direct debit, credit card, bpay
- · On expiry: Ongoing contract with no contract term
- · OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.
- · OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.
Distribution network: Ausgrid (NSW).
Included postcodes
2000, 2007-2011, 2015-2050, 2060-2077, 2079-2090, 2092-2097, 2099-2108, 2110-2114, 2118-2122, 2125-2128, 2130-2138, 2140-2141, 2143-2144, 2154, 2158-2159, 2162-2163, 2172, 2190-2200, 2203-2214, 2216-2234, 2250-2251, 2256-2265, 2267, 2278, 2280-2287, 2289-2300, 2302-2308, 2315-2330, 2333-2337, 2775
Put this plan against your usage
Published by OVO Energy under the Consumer Data Right, via the AER's Energy Made Easy, last changed by them on 1 July 2026. Figures are shown as the institution publishes them and can change without notice; confirm on their site before applying. The Finance Algorithm earns nothing from any product listed here.