HomeDeal Choice - Demand Single Rate + CL
What it charges
- Supply charge
- $1.2299
- a day
- Usage
- 24.34c
- per kWh
Per kWh
- Single rate24.34c
- Single Rate Controlled Load14.04c
- Single Rate Controlled Load14.31c
- Solar feed-in, paid to you2.00c
- Solar feed-in
- 2.00c a kWh
- Contract
- Variable prices, ongoing
Prices per kWh as published; exclusive of GST unless the retailer states otherwise.
How it compares in the Energex area
Where this plan's prices sit among the plans anyone can sign up for at home in the Energex area, as published. Each bar counts the plans at that price, and the ink line marks this plan.
Supply charge
$1.23a day on this plan
The typical plan open to anyone in the Energex area charges $1.62 a day, and the lowest $0.93, across 752 plans.
Solar feed-in
2.00cper kWh exported on this plan
The typical plan open to anyone in the Energex area that pays for exports gives 2.00c, and the most generous 35.00c, across 711 plans.
Tariff
Usage Charges1 Jul to 30 Jun
Supply $1.2299 a day| Rate | When | Blocks | Price |
|---|---|---|---|
| GeneralUsage | All times | Flat per day | 24.34c |
| Demand (c/kW/day)All Year | MON, TUE, WED, THU, FRI, SAT, SUN 16:00-20:59 | 0+ kW, day | $0.2301/KWH |
Controlled load
Controlled load
| Rate | When | Blocks | Price |
|---|---|---|---|
| Single Rate Controlled LoadCL1 | All times | Flat per day | 14.04c |
Controlled load
| Rate | When | Blocks | Price |
|---|---|---|---|
| Single Rate Controlled LoadCL2 | All times | Flat per day | 14.31c |
Solar feed-in
- Single Rate Solar FiTOther scheme, paid by retailer2.00c a kWh
Retailer FiT (ex GST)
- Single Rate Solar FiTOther scheme, paid by government46.00c a kWh
Solar Bonus Scheme (ex GST)
Discounts and incentives
- $200 Delayed Credit
New or moving customers only. Bonus credit applied after 90 days provided you're still on this Energy Plan at that time. Credits can't be transferred/exchanged or paid out. Bonus credits limited to 1 per account in any 12-month period.
Fees
| Fee | Term | Amount | Notes |
|---|---|---|---|
| Disconnection | Fixed | $0 | Disconnection fee. Fee may vary, please see additional fee information. |
| Reconnection | Fixed | $0 | Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information. |
| Other | Fixed | $165.29 | Wasted Visit fee (VI not complete). Fee may vary, please see additional fee information. |
| Connection | Fixed | $0 | Move-in (Power on). Fee may vary, please see additional fee information. |
| Reconnection | Fixed | $159.05 | Out of Business Hours Reconnection (VI Required). Fee may vary, please see additional fee information. |
| Disconnect move out | Fixed | $0 | Move-out (Final Read). Fee may vary, please see additional fee information. |
| Other | Fixed | $22.96 | Special Read. Fee may vary, please see additional fee information. |
| Payment processing | Fixed | $3.40 | A fee for paying a bill over the counter at Australia Post. This fee will appear in the next bill after payment. |
| Paper bill | Fixed | $1.95 | A fee to cover the cost of printing and mailing the bill. This fee will appear in the next bill after payment. |
| Late payment | Fixed | $12 | A fee to cover the cost associated with late payment. This fee will appear in the next bill after payment. |
Eligibility
- No restrictions published.
Terms
- Prices variable: Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.
- 10-day cooling off period
- Billed monthly
- Pay by direct debit, credit card, paper bill, bpay, other
- This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.
- We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy…
Where it's offered
Distribution network: Energex (QLD).
Included postcodes
4000, 4005-4014, 4017-4022, 4030-4032, 4034-4037, 4051, 4053-4055, 4059-4061, 4064-4070, 4073-4078, 4101-4125, 4127-4133, 4151-4161, 4163-4165, 4169-4174, 4178-4179, 4183-4184, 4205, 4207-4218, 4220-4221, 4223-4228, 4270-4272, 4275, 4280, 4285, 4287, 4300-4301, 4303-4307, 4309-4314, 4340-4344, 4346-4347, 4350, 4352, 4359, 4500-4521, 4550-4575, 4580-4581
Compare it with other plans
Put this plan against your usage
Published by Alinta Energy under the Consumer Data Right, via the AER's Energy Made Easy, last changed by them on 1 Oct 2026. Figures are shown as the institution publishes them and can change without notice; confirm on their site before applying. The Finance Algorithm earns nothing from any product listed here.