The Finance Algorithm
Flow Power

Flow Home

ElectricityMarket offerResidentialQLDRetailer updated 1 Oct 2026

What it charges

Supply charge
$1.2746
a day
Usage
27.44c
per kWh
Solar feed-in
2.00c a kWh
Contract
Variable prices, ongoing

Prices per kWh as published; exclusive of GST unless the retailer states otherwise.

How it compares in the Energex area

Where this plan's prices sit among the plans anyone can sign up for at home in the Energex area, as published. Each bar counts the plans at that price, and the ink line marks this plan.

Usage rate

27.44cper kWh on this plan

The typical single-rate plan open to anyone in the Energex area charges 25.43c, and the lowest 20.00c, across 256 plans.

Supply charge

$1.27a day on this plan

The typical single-rate plan open to anyone in the Energex area charges $1.75 a day, and the lowest $1.08, across 256 plans.

Solar feed-in

2.00cper kWh exported on this plan

The typical plan open to anyone in the Energex area that pays for exports gives 2.00c, and the most generous 35.00c, across 711 plans.

Tariff

Single Rate Tariff Period1 Jul to 30 Jun

Supply $1.2746 a day
RateWhenBlocksPrice
PeakPeakAll timesFlat per year27.44c

Solar feed-in

  • Solar FiTOther scheme, paid by retailer2.00c a kWh

    Flow Power offers 2 cents per kWh exported. This rate is uncapped.

Discounts and incentives

  • $150 (Incl. GST) Welcome Credit $150Other, conditional

    Applies to new customers only. To receive the full $150 credit (incl. GST), you must stay with Flow Power for 6 months, with a $25 credit applied across each of the first 6 electricity bills.

Fees

FeeTermAmountNotes
ReconnectionFixed$23.27Reconnection fee
DisconnectionFixed$23.27Disconnection fee

Eligibility

  • GreenPower: This offer has 100% green power included in the offer rates.

Terms

  • Prices variable: Usage rates are not fixed. For more information about our pricing visit flowpower.com.au/residential/pricing/our-pricing
  • 10-day cooling off period
  • Billed monthly or quarterly
  • Pay by direct debit
  • See Flow Power Market Retail Contract Agreement Terms at flowpower.com.au/residential/policies/
  • Additional fees may apply. For more information, please visit the retailer's website at flowpower.com.au/residential/policies/

Where it's offered

Distribution network: Energex (QLD).

Included postcodes

4000, 4005-4014, 4017-4022, 4030-4032, 4034-4037, 4051, 4053-4055, 4059-4061, 4064-4070, 4073-4078, 4101-4125, 4127-4133, 4151-4161, 4163-4165, 4169-4174, 4178-4179, 4183-4184, 4205, 4207-4218, 4220-4221, 4223-4228, 4270-4272, 4275, 4280, 4285, 4287, 4300-4301, 4303-4307, 4309-4314, 4340-4344, 4346-4347, 4350, 4352, 4359, 4500-4521, 4550-4575, 4580-4581

Published by Flow Power under the Consumer Data Right, via the AER's Energy Made Easy, last changed by them on 1 Oct 2026. Figures are shown as the institution publishes them and can change without notice; confirm on their site before applying. The Finance Algorithm earns nothing from any product listed here.