GloBird ZEROHERO Residential (Flexible Rate With CL) Citipower
- Supply charge
- $1.2800/day
- Usage per kWh
- 37.00c shoulder
- Contract
- Variable prices · ongoing
Prices per kWh as published; exclusive of GST unless the retailer states otherwise.
Period
Supply $1.2800/day| Rate | When | Blocks | Price |
|---|---|---|---|
| Shoulder | Every day 16:00–23:00 | Flat per day | 37.00c |
| Shoulder | Every day 12:00–15:00 | first 50 kWh per day at 0.00c, then 23.00c | 0.00c |
| Shoulder | Every day 15:00–16:00; Every day 23:00–00:00; Every day 00:00–12:00 | Flat per day | 28.00c |
Controlled Load
| Rate | When | Blocks | Price |
|---|---|---|---|
| Controlled LoadTime switch controlled hot water services, space heaters and other dedicated loads | All times | Flat | 23.00c |
- Current FIT policyCurrent · paid by retailer0.00c/kWh
TOU Solar feed-in (incl. GST if any)
- Perfect if you love free stuff
Perfect if you love free stuff
$0.00 for the first 50kwh/day between 12pm-3pm (Local Time), excluding controlled load.
- ZEROHERO Credit
ZEROHERO Credit
$1/Day when imports are 0.03 kWh/hour or less, between 6pm-9pm (Local Time).
- Super Export Credit
Super Export Credit
10 cents/kWh applies to the first 15 kWh of exports between 6pm-9pm (Local Time) everyday, and is inclusive of any other Feed-in tariff as applicable in Energy Plan.
- Critical Peak-Export Credit
Critical Peak-Export Credit
$1/kWh applies to any export during a Critical Peak-Export event. The timing of these events is determined at our discretion, as detailed in a notice we provide. Your premises' metering installation must support 5-minute interval data.
- Critical Peak-Import Credit
Critical Peak-Import Credit
5 cents/kWh applies to any import during a Critical Peak-Import event. The timing of these events is determined at our discretion, as detailed in a notice we provide. Your premises' metering installation must support 5-minute interval data.
- Peak solar feed-in
Peak solar feed-in
2 cents/kWh applies to exports between 4pm-11pm (Local Time) everyday.
| Fee | Term | Amount | Notes |
|---|---|---|---|
| Other | Percent of bill | 0% of bill | 0 Credit Card Payment Processing Fee |
| Connection | Fixed | $15 | This is smart meter remote re-connection fee. It assumes a smart meter being remotely connected during business hours when we have been given enough prior notice. However, the fee can vary depending on the type of meter, the location, and… |
| Disconnection | Fixed | $15 | This is a smart meter remote disconnection fee, however, this fee can vary depending on your type of meter, the meter location, and other factors. |
| Other | Fixed | $4 | Paper Bill. If you have opted to receive a paper bill by post |
- · Other: You must have installed an eligible battery and solar-PV. You must have an eligible smart meter. For eligibility criteria call 133456.
- · Prices variable: Rates and credits are usually reset one calendar month after the effective date of the approved network tariffs. We'll notify you in writing prior to any change.
- · 10-day cooling off period
- · Billed monthly
- · Pay by other
- · On expiry: No contract term, no exit fees. You can switch to another provider without penalty. We will always notify you before we change your discounts, prices or rates.
- · This offer is for VIC residential customers who have a Qualifying System and must meet and remain compliant with the Eligibility Criteria and all other requirements of the Virtual Power Plant Terms and Conditions. For further information a…
Distribution network: Citipower (VIC).
Included postcodes
3000, 3002-3006, 3008, 3010-3011, 3031, 3051-3057, 3065-3068, 3070-3071, 3078, 3101-3104, 3121-3127, 3129, 3141-3144, 3161, 3181-3183, 3205-3207
Put this plan against your usage
Published by GloBird Energy under the Consumer Data Right, via the AER's Energy Made Easy, last changed by them on 1 July 2026. Figures are shown as the institution publishes them and can change without notice; confirm on their site before applying. The Finance Algorithm earns nothing from any product listed here.