The Finance Algorithm
MYOB powered by OVO

The EV Plan

ElectricityMarket offerResidentialNSWRetailer updated 17 Sept 2026
At a glance
Supply charge
$1.6029/day
Usage per kWh
54.72c peak · 21.85c off-peak · 4.09c shoulder
Solar feed-in
1.00c/kWh
Contract
Variable prices · ongoing

Prices per kWh as published; exclusive of GST unless the retailer states otherwise.

§ 01 — Tariff · 4 periods

Summer: 1 Nov to 31 Mar11-01 to 03-31

Supply $1.6029/day
RateWhenBlocksPrice
PeakPeak: 3pm-9pm All DaysEvery day 15:00–20:59Flat per day54.72c
Off-peak6am - 3pm, 9pm - 12amEvery day 06:00–14:59; Every day 21:00–23:59Flat per day21.85c
Shoulder12am - 6amEvery day 00:00–05:59Flat per day4.09c

Shoulder 1: 1 Apr to 31 May04-01 to 05-31

Supply $1.6029/day
RateWhenBlocksPrice
Off-peak6am- 12amEvery day 06:00–23:59Flat per day21.85c
Shoulder12am - 6amEvery day 00:00–05:59Flat per day4.09c

Winter: 1 Jun to 31 Aug06-01 to 08-31

Supply $1.6029/day
RateWhenBlocksPrice
Peak3pm-9pm, all daysEvery day 15:00–20:59Flat per day54.72c
Off-peak6am - 3pm, 9pm - 12amEvery day 06:00–14:59; Every day 21:00–23:59Flat per day21.85c
Shoulder12am - 6amEvery day 00:00–05:59Flat per day4.09c

Shoulder 2: 1 Sep to 31 Oct09-01 to 10-31

Supply $1.6029/day
RateWhenBlocksPrice
Off-peak6am- 12amEvery day 06:00–23:59Flat per day21.85c
Shoulder12am - 6amEvery day 00:00–05:59Flat per day4.09c
§ 03 — Solar feed-in
  • FiTOther · paid by retailer1.00c/kWh

    OVO Energy Retailer Feed-in-Tariff (exclusive of GST)

§ 04 — Discounts & incentives
  • EV Off-Peak

    $0.045/kWh usage charge between midnight and 6am. Does not apply to controlled loads. For more information head to www.ovoenergy.com.au/electric-vehicles/

  • Interest Rewards

    OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill.

§ 05 — Fees
FeeTermAmountNotes
ConnectionFixed$123.56Connection fee - Site Visit (inc GST). Fees may vary for some customers.
DisconnectionFixed$123.56A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.
OtherFixed$0Other fees may apply. Please refer to www.ovoenergy.com.au/fees.
§ 06 — Eligibility
  • · Other: Electric Vehicle requirement - Must own an electric vehicle.
  • · GreenPower: 100% GreenPower for 2.2 c/kWh inc. GST.
§ 07 — Terms
  • · Prices variable: OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.
  • · 10-day cooling off period
  • · Billed monthly
  • · Pay by direct debit
  • · On expiry: Ongoing contract with no contract term
  • · OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.
  • · OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.
§ 08 — Where it is offered

Distribution network: Ausgrid (NSW).

Included postcodes

2000, 2007-2011, 2015-2050, 2060-2077, 2079-2090, 2092-2097, 2099-2108, 2110-2114, 2118-2122, 2125-2128, 2130-2138, 2140-2141, 2143-2144, 2154, 2158-2159, 2162-2163, 2172, 2190-2200, 2203-2214, 2216-2234, 2250-2251, 2256-2265, 2267, 2278, 2280-2287, 2289-2300, 2302-2308, 2315-2330, 2333-2337, 2775

Published by MYOB powered by OVO under the Consumer Data Right, via the AER's Energy Made Easy, last changed by them on 17 Sept 2026. Figures are shown as the institution publishes them and can change without notice; confirm on their site before applying. The Finance Algorithm earns nothing from any product listed here.