Origin Affinity Variable - Comparable - Sept'26 (Residential Demand with Dedicated Circuit)
- Supply charge
- $1.1293/day
- Usage per kWh
- 18.16c
- Solar feed-in
- 1.00c/kWh
- Contract
- Variable prices · 1 yr
Prices per kWh as published; exclusive of GST unless the retailer states otherwise.
Summer Demand12-01 to 03-31
Supply $1.1293/day| Rate | When | Blocks | Price |
|---|---|---|---|
| Rate | All times | Flat | 18.16c |
Summer Demand12-01 to 03-31
| Rate | When | Blocks | Price |
|---|---|---|---|
| DemandDecember-March Mon-Fri Ex public holidays 3 pm to 9 pm Local Time | MON, TUE, WED, THU, FRI 15:00–21:00 | 0+ kW, month | $0.3669/KWH |
Non - Summer Demand04-01 to 11-30
Supply $1.1293/day| Rate | When | Blocks | Price |
|---|---|---|---|
| Rate | All times | Flat | 18.16c |
Non - Summer Demand04-01 to 11-30
| Rate | When | Blocks | Price |
|---|---|---|---|
| DemandApril-November Mon-Fri Ex public holidays 3 pm to 9 pm Local Time | MON, TUE, WED, THU, FRI 15:00–21:00 | 0+ kW, month | $0.1188/KWH |
Dedicated Circuit
| Rate | When | Blocks | Price |
|---|---|---|---|
| Controlled LoadAll Dedicated Circuit | All times | Flat | 14.59c |
- Current FIT policyCurrent · paid by retailer1.00c/kWh
Feed-In Tariff Scheme
- Account Credit
Account Credit
$255 (inc GST) credit will be applied to your account after sign-up. You will see it on MyAccount and it will be applied to your electricity bill. Credit is not redeemable for cash.
| Fee | Term | Amount | Notes |
|---|---|---|---|
| Disconnection | Fixed | $80.60 | A $80.60 (GST Incl) fee may apply when your property is disconnected (including when you move). This fee is passed through from your distributor and may vary. Please visit your distributor's website to find out the current fee. You must pa… |
| Reconnection | Fixed | $75.83 | A $75.83 (GST Incl) fee may apply when your property is reconnected (including when you move). This fee is passed through from your distributor and may vary. Please visit your distributor's website to find out the current fee. |
| Cc processing | Percent of bill | 0.27% of bill | A 0.27% fee (GST Incl) may apply to payments made by VISA debit card. |
| Payment processing | Fixed | $2.70 | If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply. |
| Other | Fixed | $2.15 | $2.15 (incl GST) applies for each paper bill. |
| Cc processing | Percent of bill | 0.65% of bill | A 0.65% fee (GST Incl) may apply to payments made by VISA credit card. |
| Cc processing | Percent of bill | 0.33% of bill | A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card. |
| Cc processing | Percent of bill | 0.67% of bill | A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card. |
| Cc processing | Percent of bill | 0.64% of bill | A 0.64% fee (GST Incl) may apply to payments made by American Express credit card. |
- · Other: Offer only available through Comparable.
- · GreenPower: For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources
- · GreenPower: For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources
- · Contract term: 1 yr
- · Prices variable: We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.
- · 10-day cooling off period
- · Billed monthly
- · Pay by paper bill
- · On expiry: We'll give you notice before your contract ends. At the end of the contract term, we will continue to sell you energy and the terms and conditions of the Standard Retail Contract will apply, unless you tell us otherwise.
- · Not available in all areas or property types. Residential customers only. See www.originenergy.com.au/2889/Terms-and-conditions for more.
Distribution network: Powercor (VIC).
Included postcodes
3008, 3012-3013, 3015-3016, 3018-3030, 3034, 3036-3038, 3211-3228, 3230-3243, 3249-3251, 3254, 3260, 3264-3287, 3289, 3292-3294, 3300-3305, 3309-3312, 3314-3315, 3317-3319, 3321-3325, 3328-3338, 3340-3342, 3345, 3350-3352, 3355-3358, 3360-3361, 3363-3364, 3370-3371, 3373-3375, 3377-3381, 3384-3385, 3387-3388, 3390-3393, 3395-3396, 3400-3401, 3407, 3409, 3412-3415, 3418-3420, 3423-3424, 3427, 3430-3435, 3437-3438, 3440-3442, 3444, 3446-3448, 3450-3451, 3453, 3458, 3460-3465, 3467-3469, 3472, 3475, 3477-3478, 3480, 3482-3483, 3485, 3487-3491, 3494, 3496, 3498, 3500-3501, 3505-3507, 3509, 3512, 3515-3518, 3520-3523, 3525, 3527, 3529-3531, 3533, 3537, 3540, 3542, 3544, 3546, 3549-3551, 3555-3559, 3561-3568, 3570-3573, 3575-3576, 3579-3581, 3583-3586, 3588-3591, 3594-3597, 3599, 3608, 3610, 3612, 3614, 3616-3618, 3620-3624, 3629-3631, 3633-3641, 3644, 3646-3647, 3649, 3662, 3666, 3669, 3685, 3725, 3727-3728, 3730, 3756, 3762, 3764
Put this plan against your usage
Published by Origin Energy under the Consumer Data Right, via the AER's Energy Made Easy, last changed by them on 16 Sept 2026. Figures are shown as the institution publishes them and can change without notice; confirm on their site before applying. The Finance Algorithm earns nothing from any product listed here.