Sumo Sunrise Plus
- Supply charge
- $0.9443/day
- Usage per kWh
- 35.51c shoulder
- Solar feed-in
- 1.00c/kWh
- Contract
- Variable prices · ongoing
Prices per kWh as published; exclusive of GST unless the retailer states otherwise.
Period
Supply $0.9443/day| Rate | When | Blocks | Price |
|---|---|---|---|
| Shoulder | Every day 16:00–21:00 | Flat per month | 35.51c |
| Shoulder | Every day 11:00–16:00 | Flat per month | 13.11c |
| Shoulder | Every day 00:00–11:00; Every day 21:00–00:00 | Flat per month | 16.84c |
Controlled Load
| Rate | When | Blocks | Price |
|---|---|---|---|
| Controlled LoadControlled load | All times | Flat | 15.72c |
- Current FIT policyCurrent · paid by retailer1.00c/kWh
Current Feed-In Tariff (Unavailable in conjunction with other FIT)
| Fee | Term | Amount | Notes |
|---|---|---|---|
| Cc processing | Percent of bill | 0.7% of bill | A fee of 0.7% may apply to payments made by credit card. |
| Other | Fixed | $0 | We may pass through any fee imposed by your distributor in relation to services performed at your supply address. |
- · Other: Available to new customers setting up a Sumo residential account who meet our credit requirements (a satisfactory credit check).
- · Prices variable: Prices, fees and charges are subject to change. For increases, notice will be at least 5 business days prior, for decreases, the notice will be issued as soon as practicable and no later than your next invoice.
- · 10-day cooling off period
- · Billed monthly
- · Pay by paper bill
- · On expiry: Ongoing contract
- · Please refer to our website for full terms and conditions: https://www.sumo.com.au/help-and-support/terms-and-conditions/sumo-terms-and-conditions
Distribution network: AusNet Services (electricity) (VIC).
Included postcodes
3061-3062, 3064, 3074-3076, 3082-3085, 3087-3091, 3093-3097, 3099, 3106, 3109, 3111, 3113-3116, 3132-3140, 3152-3156, 3158-3160, 3175, 3178-3180, 3434, 3521-3522, 3607-3608, 3610, 3612, 3631, 3646, 3658-3660, 3662-3666, 3669-3670, 3672-3673, 3675, 3677-3678, 3682-3683, 3685, 3687-3688, 3690-3691, 3695, 3697-3701, 3704-3705, 3707-3709, 3711-3715, 3717-3720, 3722-3723, 3725-3728, 3730, 3732-3733, 3735-3741, 3744, 3746-3747, 3749-3767, 3770, 3775, 3777-3779, 3781-3783, 3785-3789, 3791-3793, 3795-3797, 3799, 3802-3810, 3812-3816, 3818, 3820-3825, 3831-3833, 3835, 3840, 3842, 3844, 3847, 3850-3852, 3854, 3856-3860, 3862, 3864-3865, 3869-3871, 3873-3875, 3878, 3880, 3882, 3885-3893, 3895-3896, 3898, 3900, 3902-3904, 3909, 3912, 3921-3923, 3925, 3945-3946, 3950-3951, 3953-3954, 3956-3960, 3962, 3964-3967, 3971, 3975-3981, 3984, 3987-3988, 3990-3992, 3995-3996
Put this plan against your usage
Published by Sumo Power (legacy) under the Consumer Data Right, via the AER's Energy Made Easy, last changed by them on 18 Aug 2026. Figures are shown as the institution publishes them and can change without notice; confirm on their site before applying. The Finance Algorithm earns nothing from any product listed here.