The Finance Algorithm
Sumo Power (legacy)

Sumo Static

ElectricityMarket offerResidentialNSWRetailer updated 19 Oct 2026

What it charges

Supply charge
$1.4355
a day
Usage
28.61c
per kWh
Solar feed-in
3.30c a kWh
Contract
Variable prices, ongoing

Prices per kWh as published; exclusive of GST unless the retailer states otherwise.

How it compares in the Ausgrid area

Where this plan's prices sit among the plans anyone can sign up for at home in the Ausgrid area, as published. Each bar counts the plans at that price, and the ink line marks this plan.

Usage rate

28.61cper kWh on this plan

The typical single-rate plan open to anyone in the Ausgrid area charges 28.99c, and the lowest 24.00c, across 253 plans.

Supply charge

$1.44a day on this plan

The typical single-rate plan open to anyone in the Ausgrid area charges $1.44 a day, and the lowest $0.75, across 253 plans.

Solar feed-in

3.30cper kWh exported on this plan

The typical plan open to anyone in the Ausgrid area that pays for exports gives 3.00c, and the most generous 35.00c, across 761 plans.

Tariff

Single Rate Tariff Period

Supply $1.4355 a day
RateWhenBlocksPrice
PeakAny timeAll timesFlat per day28.61c

Solar feed-in

  • Sumo Static FiT: Stepped Rate Feed In TariffOther scheme, paid by retailer3.30c a kWh

    0-9kWh/day | Sumo Static Feed-In

  • Sumo Static FiT: Stepped Rate Feed In TariffOther scheme, paid by retailer0.00c a kWh

    9kWh+/day | Sumo Static Feed-In

Fees

FeeTermAmountNotes
ConnectionFixed$17.26A connection fee may apply

Eligibility

  • No restrictions published.

Terms

  • Prices variable: Prices, fees and charges are subject to change. For increases, notice will be at least 5 business days prior, for decreases, the notice will be issued as soon as practicable and no later than your next invoice.
  • 10-day cooling off period
  • Billed monthly or quarterly
  • Pay by direct debit, credit card, bpay, paper bill, other
  • On expiry: Your contract is ongoing until it is ended by you or us.
  • Please refer to our website for full terms and conditions: https://www.sumo.com.au/help-and-support/terms-and-conditions/sumo-terms-and-conditions.
  • We may pass through any fee imposed by your distributor in relation to services performed at your supply address.

Where it's offered

Distribution network: Ausgrid (NSW).

Included postcodes

2000, 2007-2011, 2015-2050, 2060-2077, 2079-2090, 2092-2097, 2099-2108, 2110-2114, 2118-2122, 2125-2128, 2130-2138, 2140-2141, 2143-2144, 2154, 2158-2159, 2162-2163, 2172, 2190-2200, 2203-2214, 2216-2234, 2250-2251, 2256-2265, 2267, 2278, 2280-2287, 2289-2300, 2302-2308, 2315-2330, 2333-2337, 2775

Published by Sumo Power (legacy) under the Consumer Data Right, via the AER's Energy Made Easy, last changed by them on 19 Oct 2026. Figures are shown as the institution publishes them and can change without notice; confirm on their site before applying. The Finance Algorithm earns nothing from any product listed here.