Origin Everyday Rewards Variable - July'26
- Supply charge
- $0.8431/day
- Usage per MJ
- 3.69c
- Contract
- Variable prices · 1 yr
Prices per MJ as published; exclusive of GST unless the retailer states otherwise.
All Consumption02-01 to 01-31
Supply $0.8431/day| Rate | When | Blocks | Price |
|---|---|---|---|
| Rate | All times | Flat per day | 3.69c |
- Everyday Rewards Points
Everyday Rewards Points
You will receive up to 5000 one-off Everyday Rewards points, approximately 45 days after your Acceptance date and ongoing 1 Everyday Rewards point per $1 (incl GST) charged on your bill for your usage and supply during energy plan period.
| Fee | Term | Amount | Notes |
|---|---|---|---|
| Disconnection | Fixed | $17.38 | A $17.38 (GST Incl) fee may apply when your property is disconnected (including when you move). You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your suppl… |
| Cc processing | Percent of bill | 0.27% of bill | A 0.27% fee (GST Incl) may apply to payments made by VISA debit card. |
| Payment processing | Fixed | $2.70 | If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply. |
| Other | Fixed | $2.15 | $2.15 (incl GST) applies for each paper bill. |
| Cc processing | Percent of bill | 0.65% of bill | A 0.65% fee (GST Incl) may apply to payments made by VISA credit card. |
| Cc processing | Percent of bill | 0.33% of bill | A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card. |
| Cc processing | Percent of bill | 0.67% of bill | A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card. |
| Cc processing | Percent of bill | 0.64% of bill | A 0.64% fee (GST Incl) may apply to payments made by American Express credit card. |
- · Other: Offer only available to registered Everyday Rewards membership at the time of sign-up.
- · Contract term: 1 yr
- · Prices variable: Your usage and supply Charges and other charges such as charges for Add-ons and any solar feed-in tariff may change during the Energy Plan period. If they do change, we will let you know.
- · 10-day cooling off period
- · Billed every 2 months
- · Pay by paper bill
- · On expiry: We'll give you notice before your contract ends. At the end of the contract term, we will continue to sell you energy and the terms and conditions of the Standard Retail Contract will apply, unless you tell us otherwise.
- · Not available all areas or property types. Residential customers only. See www.originenergy.com.au/2889/Terms-and-conditions for more.
Distribution network: Australian Gas Networks (VIC).
Included postcodes
3636, 3640-3641, 3644, 3646, 3683, 3685, 3687, 3730
Put this plan against your usage
Published by Origin Energy under the Consumer Data Right, via the AER's Energy Made Easy, last changed by them on 3 July 2026. Figures are shown as the institution publishes them and can change without notice; confirm on their site before applying. The Finance Algorithm earns nothing from any product listed here.